24 September 2014

Retaining Wall Rebuild

When we purchased our home, we quickly made note of the badly leaning retaining wall to the south of our house.  Something that would definitely need to be addressed but there are so many other things to work on or put improvement money towards that we didn't rank it very high.  That was the case until a 40 foot section fell over during a severe thunderstorm a month or so ago.  It was a huge section that fell and when it fell, it pretty much flopped straight forward and lots of the blocks were still in place, just laying horizontally now instead of the more effective vertical.
So began the process of asking for contractor recommendations, leaving messages, setting up times to have them come look at it, talking them through what we want and then waiting for them to give an estimate.
Amazing, I was able to get Contractor A to come by the day after it happened on Labor Day.  His rebuild plans sounded good but he didn't really have any experience with walls of this size (40' long x 4'-5' high).  Verbal estimate was in the $3000 range. Contractor B was the husband of a work colleague.  He specializes in "hardscapes" (I did not even know that this was the term for landscape jobs that are primarily concrete/block/stone etc.)  His company's website has some great examples of their work and I love having someone who you have a connection to, even if it is slight.  I figure that means less of a chance of them just doing the job to get it done.  His estimate was $2,100, but he said he was booked out until November.  He said he would try and get us worked in early though, possibly in the next 3-4 weeks. Contractor C seemed slightly impressed by the size of the job and said it'd be around a week's worth of work (the other two contractor had estimated 3-4 days) and a cost in the $5000-$6000 range.  Needless to say, we went with Contractor B.  And we were so happy we did!  He gave us a call in two weeks and had an opening and was ready to work on our wall.  It pays to spend the time to get three bids on any sizable job.
Day 1: They arrive around 8 and are gone when I get home around 4.  They have pulled all the limestone blocks out of the walkway and stacked them in the driveway and on the patio.  They have excavated the dirt, widening the walk space considerably and dumped in in a trailer they brought.  They must've called it a day a little early since they were ready to start the rebuild process the following day.  And on Day 2 they started working at 7:00 and didn't let up until 5:30.  They were grinding each block, checking it with a level, grinding again, back and forth until they had a perfect fit.  At the end of Day 2 they had the first few layers of block laid.  Day 3 they started again at 7:00 and they were gone when I got home after work.  They finished the wall, backfilled the space with a foot of clean aggregate (gravel), and put in a piece of tile to help move the water out from behind the wall.  They also improved the look of the walking path in the walkway too, using their saw to trim the bricks and filling the extra space with red gravel.  They powerwashed the limestone wall, getting all the green moss off and making it look like new and they sprayed off the patio and driveway as well.  The owner was there for short while in the mornings but for the most part it was two guys.  That is some hard work and I was happy with the finished product. 

End of Day 1.

End of Day 2.

End of Day 3.

Here's why you need a filtration sock around your tile.  
Without it, your tile fills with silt and can't do it's job.

15 September 2014

Patio Door Swap

When it was decided to replace the door to our patio, I was kicking around the idea of doing the installation myself.  The manufacturer's website rated it as a "2 Hour Install" which I am guessing would mean at least half a day for me.  So when I got to Home Depot and was informed that they were running a sale for $50 off the install fee (usually $97), my decision was made.  Save me the time and having to get the tools and supplies.  The door we wanted was out of stock and so we had to wait for about a month or so, but finally, we got the call and the installer came to swap the door for us.  I'm glad we had them do it, as he had to add a small trim piece of wood to the top of the frame to get the right fit.  It looks fantastic, is super quiet (no more slamming) and best of all - you can slide the top pane of glass down and a screen rolls out!  It helps a bunch with getting a breeze through the house.  We took this opportunity to scrape and repaint the interior door to get rid of the scratch marks from the previous owner's animal. 


03 September 2014

Ice Bucket Challenge



I think the microphone got covered up at the beginning.  I just said that stoppable had challenged me and I did not complete the challenge within the 24 hours, so we will be making a donation to ALS.  I challenged Sylvia and Isa.
It is quite a shock to the system!  And a negative side-effect is that we didn't have any ice in the house for the rest of the evening. 

02 September 2014

Photo Challege #2: Labor Day

annette

sylvia
emily
middleson
isa 
 homebase